Joplin Public Library

Facebook
Twitter
LinkedIn

In 2011, an EF5 tornado caused significant damage to Joplin, Missouri, resulting in 158 fatalities and nearly $3 billion in damages. CJD Engineering, LLC was later tasked with designing MEP Systems for the new library that would serve the community.

The new library boasts a spacious central lobby that functions as a gathering space for the community. On either side of the lobby, there are two exterior courtyards – one enclosed and the other open to the public, featuring an outdoor learning classroom and sculpture lawn. Additionally, the library design includes a community room that doubles as a storm shelter and other meeting and community spaces located in central areas.

Pictures by: SAPP Design Architects

Other Projects

Youngstown Glove Factory

CJD provided MEP design engineering services for the $15,000,000, 71,000-square-foot Youngstown Glove Co. Factory in Springfield, MO.  The new facility is equipped

Nixa Police Department

A new 21,000 square foot police department facility with offices, fitness area, evidence storage, and meeting spaces. CJD provided MEP engineering design

Springfield
2225 W. Chesterfield Blvd., Suite 200
Springfield, MO 65807
417.877.1700

St. Louis
745 Craig Road, Suite 100
Creve Coeur, MO 63141
314.282.2614

Scroll to Top