Neosho Junior High

Facebook
Twitter
LinkedIn

The New Junior High is an impressive project valued at $23 million, featuring a spacious 142,000 square foot building. It incorporates a well-organized design with a central two-story gallery that separates the public and academic areas. The academic spaces are strategically positioned around a secure open courtyard, enclosed by a two-story steel and glass structure that houses eight distinct academic neighborhoods. Each neighborhood consists of individual classrooms centered around a collaborative learning space, catering to a variety of learning environments. It’s worth noting that the MEP engineering for this project was expertly handled by CJD Engineering. On the second floor, the library offers breathtaking views of both the exterior courtyard and the main gallery. Moreover, the Gymnasium and Cafeteria, which are public spaces, feature expansive open areas constructed using Precast concrete walls and Double Tee roof construction methods.

Neosho Junior High
Neosho Junior High

Other Projects

Cavasson Hilton Hotel and Convention Center

Hilton at Cavasson, Scottsdale, AZ

Exclusively chosen, CJD Engineering, LLC, stands as the contracted MEP engineering services provider for the esteemed Hilton at Cavasson. This architectural masterpiece

Caesars-Republic-Scottsdale-Luxury-Hotel-1-2

Caesars Republic Scottsdale

CJD Engineering was responsible for MEP design services for Caesars Republic Scottsdale, an 11-story glass building with 266 guest rooms. The 147-foot

Boyd-Elementary-School

Boyd Elementary School

CJD Engineering provided MEP design services for the new Boyd Elementary School, which was constructed at a cost of just over 20

Springfield
2225 W. Chesterfield Blvd., Suite 200
Springfield, MO 65807
417.877.1700

St. Louis
745 Craig Road, Suite 100
Creve Coeur, MO 63141
314.282.2614

Scroll to Top